LHC has just completed the 2009 run successfully and did so on a ‘High Note’. This is a little over a year after the LHC originally started up with a major incident that shocked the community. To recover CERN made a major effort to fix the damage and get the LHC back to running conditions, while the experiments including our group, were somewhat relieved that we had more time to prepare for the data rolling in.

The massive quench incident at the Large Hadron Collider (LHC) occurred on September 19, 2008 (frequently associated with the 2008–2009 shutdown and repair timeline that kept the machine offline until November 2009). Here is a summary of what happened

  • The Root Cause: During high-current powering tests without a beam in Sector 3-4, a faulty electrical busbar connection (a solder/splice joint between two superconducting magnets) developed a high resistance (about 200 times higher than normal).
  • The Electrical Arc: As the current ramped up to around 9,000–12,000 amps, the bad joint melted, causing an electrical arc that burned through the superconducting cable and punctured the liquid helium enclosure. 
  • Helium Release & Quench: Superfluid liquid helium (about 6 tons total of which around 2 tons released explosively and 4 more tons leaked out afterward) rapidly boiled off and expanded into the insulation vacuum and tunnel.
  • Mechanical Damage: The massive pressure wave displaced heavy cold masses and ruptured the vacuum barriers and support anchorages. 

Damage and Repairs

  • Affected Magnets: A total of 53 superconducting magnets (dipoles and quadrupoles) were damaged or contaminated by soot and debris and had to be removed, cleaned, or replaced.
  • Downtime: The accident forced a massive repair and safety overhaul. Engineers fixed the connections, added upgraded pressure-relief valves, and improved magnet anchoring.
  • Restart: Repairs lasted through late 2008 and 2009, and the LHC successfully restarted beam operations in November 2009.