MIT Tier-2 Power Outage
There were arcs seen on the electrical switch gear that required a shutdown. The power outage at Bates started on Monday morning (11/03/2025) at around 10:30 a.m. All worker nodes went down, the UPS row including our CephFS storage and the networking switch stayed online. At 1:30 p.m. the problem was resolved by the Middleton … Read more